references - Autojeřáby MALINA - pronájem, půjčovna
Cranes MALINA / 20 - 250 t / Crane lease / For 16 years we have been here for you
References
- Revolving drums disassembly (january 2011)
- Bridge - Hranice na Moravě (2009)
- Zlate Moravce (duben 2010)
- Machinery assembly - Industrial Zone Ostrava
- Bridge disassembly - Jablunkov (2010)
- Reservoir disassembly - Ostrava (únor 2011)
- Gantry crane disassembly - Kopřivinice
- IBC Tower crane disassembly - Ostrava (2010)
- Gangway assembly - Baška (August 2010)
- Chimney assembly - Rožnov p. Radhoštěm (February 2011)
- Gangway assembly - Nový Hrozenkov (2010)
- Hangar assembly - Ostrava
- Press assembly - Opava (2010)
- Press assembly - Ostrava (October 2010)
- Bridge assembly - Hrozenkov
- Assembly of flying ash tank - Ostrava (září 2010)
- Prefab assembly - Kopřivnice (August 2010)
- Tower crane disassembly - (duben 2011)
- Air conditioning assembly - Břidličná (září 2010)
- Air conditioning assembly - Ostrava (2010)
- Railway bridge assembly - Příbor (září 2010)
- Loading of tanks 170 t - Děčín (2010)
- Loading of gravel vessels - (April 2010)
- Press repair - Ostrava (August 2010)
- Transhipment - Chotěbuz (2010)
Revolving drums disassembly (january 2011)
Job description: Disassembly of 2 trammels; Applied machinery: …; Weight of each trammel: 80,000 kg - The disassembly was done in an assembly hall with a lack space for erecting auto crane boom arms.






